
State-owned   SAILBSE 0.00 % today said it has supplied 80 per cent steel required for the   construction of Sardar Sarovar Project, inaugurated by Prime Minister   Narendra Modi.  "Once again   partnering in one of the most prestigious and important national projects,   Steel Authority of IndiaBSE 0.00 % Ltd (SAIL) has supplied 80 per cent steel   required for construction of the Sardar Sarovar Project inaugurated by Prime   Minister Narendra Modi today," the public sector firm said in a   statement.  SAIL supplied   around 85,000 tonnes of steel (TMT) for the entire Sardar Sarovar Narmada   Nigam Ltd (SSNNL) project which comprises all the canals throughout Gujarat   which are connected to Narmada River and Dam, the statement said.  The Sardar   Sarovar project is the second largest concrete gravity dam (by volume) and   has the worlds third largest spillway discharging capacity.  The Sardar   Sarovar Dam is a gravity dam built on Narmada river ne ar Navagam, Gujarat,   which will benefit four states -- Gujarat, Madhya Pradesh, Maharashtra and   Rajasthan, the company said.  A part of the   Narmada Valley Project, it will help in irrigation and electrical power   supply.  The company said   it is a part of a large hydraulic engineering project, involving the   construction of a series of large irrigation and hydroelectric multi-purpose   dams on the Narmada river.  One of the 30   dams planned on river Narmada, Sardar Sarovar Dam (SSD) is the largest   structure to be built.  "The   project will irrigate more than 18,000 m2 (190,000 sq ft), most of it in   drought prone areas of KutchBSE 4.96 % and Saurashtra. The total installed   capacity of the power facilities is 1,450 MW," the steel major said.   | 
CAMT©2005- Tel:+86-010-63265698,63317297 IT Support: HangZhou Goldensoft System Co.,Ltd.
服务热线:010-59231580